Photo Gallery of Modular Home Site Preparation and Setting:

(click any picture to enlarge)

Lot Preparation:

Trees Cleared - Ready for Road Construction

First Day of Road Construction

Clearing Road Bed

Road Drainage Installation

Road Complete to Building Site


Pouring Modular Home Foundation:

Excavation for Pouring Basement Complete

Footings and Pier Pads Poured

Foundation Being Poured

Foundation Poured

Forms Removed, Drain Tile and Waterproofing Complete


Setting the Modular Home:

Installing 8" Wide Flange Beam and 3 Jackposts

Raising the Back of House

Setting Back of House (roof is still lowered)

Raising the Hinged Roof on Back of House

Second Half of House Arrives

Tricky Track Hoe Work to Position House in Tight Area

Setting Front Half of Home (roof raised)

Home Nearly Set

Our Home Is In Place!

Septic System in and Retaining Wall Nearly Complete


Finishing the Inside of Modular Home:

All Supplies to Complete Home are Shipped Inside the House

Kitchen Cabinets and Appliances are Transported in Place

Whirlpool Tub is Transported in Place

Laundry Room Cabinets are Tranported in Place

Ready for Guests New Year's Eve - Ten Days After Receiving Occupancy Permit


 